Then, the electrician, Cory Best, came out on Tuesday night at 4 pm. We did a walk-through with him for switches/light needs. He and 2 guys worked until after 10. Cory was there the next day putting in boxes, then a crew of 4 guys came and they worked until after 11 pm getting all of the cords pulled through. Cory will still have to finish some wiring, but he did pretty well in getting a big chunk knocked out.
Mark the builder will be back tomorrow to do siding on the part of the house where the electrical meter needs to go on the house, then we will have electricity in the house!
Webb's crew is set to pour the concrete slab on the porch, but not sure with the snow forecast if/when that will get done. Not a major thing to get done.
Our spa/shower and the girls.

The gas line was installed on Dec. 4...Dave had to get the backhoe out because the ground was already frozen. In the meantime, the dogs got out of their area, so Dave was trying to chase them with the backhoe. Crazy dogs! They didn't go too far. It is time for the electric fence to keep them inside! Mark is going to paint this! We need gas for our stovetop. Everything else is electric.
The gas line was installed on Dec. 4...Dave had to get the backhoe out because the ground was already frozen. In the meantime, the dogs got out of their area, so Dave was trying to chase them with the backhoe. Crazy dogs! They didn't go too far. It is time for the electric fence to keep them inside! Mark is going to paint this! We need gas for our stovetop. Everything else is electric.